New driveways, parking lots and private roads installed with proper base prep and grading, so the surface holds up for decades across MA, RI, CT and South Florida.
A paved surface is only as good as what is underneath it. Most premature cracking and potholes trace back to a rushed base. Our crews take the time to excavate, grade and compact a proper foundation before a single ton of asphalt is laid, so your driveway or lot performs for the long haul.
From a single residential driveway to a multi-acre commercial parking lot, the same standard applies. We handle the full scope in-house: site prep, drainage, base, paving, compaction and clean edges.
What's included
Site excavation, grading and drainage planning
Compacted stone base built for your soil and load
Hot-mix asphalt laid and rolled to a smooth finish
With a proper base and periodic sealcoating, a residential asphalt driveway commonly lasts 20 to 30 years. The foundation and drainage matter more than the asphalt thickness alone.
You can typically walk on new asphalt within hours and drive on it after about 24 to 72 hours, depending on temperature. We will give you exact guidance for your job.